log/2026-11-15-jig-0.7.0
The first release of the line 0.7: heavy checks share a limited number of slots on the host, and a running unit can get a new expected time.
Changes
+A row of "checks.tsv" may have a fifth column, its weight, "heavy" or "light". The host config may set "HEAVY_SLOTS", the number of heavy rows that may run at once on the host. A heavy row in "jig run-check" waits for a free slot, and the wait does not count toward the time cap of the row.
+"jig wait PROJECT ID --expected MINUTES" gives a running unit a new expected time. Every wait that already runs, and a running "jig batch", follow the new value.
*"jig start" sets "core.hooksPath" of a product clone to "hooks" when the product tracks files in "hooks/" and no git config sets the value yet. It leaves alone a pre-commit hook that the product tracks.
*The product clone inside the "-dev" clone, the place of the releases before 0.6, is no longer found by any tool.
*"jig run-check" handles SIGTERM, SIGHUP and SIGINT: it ends the whole process group of the command, frees its slot and exits 128 plus the signal number.
*"jig release prepare" reads every row of "checks.tsv" with the same reader as "jig run-check". A bad time cap on a row of any account now refuses.
*"jig new" says how to recover when it refuses a product clone with no "-dev" clone beside it.
Get it
sha256a9ff0a791213ff7ac4f843009037e3eb2adf587adf64b1e1403d8b899caed1d1
j older · k newer · q back to the log